Rules in Belgium

Since 17 April 2025, plug-and-play devices, including plug-in batteries, may be used throughout Belgium, provided that the model is on the Synergrid list. The registration obligation differs by region. Sources accessed on 27/09/2026.

In short

  • Only devices with CE marking that are on the Synergrid plug-and-play list (extract C10/26) are allowed.
  • Flanders: registration is mandatory within 30 days from 800 W or without a digital meter. Register the device as well if you want payment for its exported electricity.
  • Wallonia and Brussels: every plug-and-play device must be registered with the grid operator.
  • A plug-in battery is controlled via an energy management system that measures at the connection point: via the P1 port of the digital meter or an EnFluRi sensor.
  • Plug the device directly into a fixed wall socket, without an extension cable.

Which devices are allowed?

Synergrid, the federation of Belgian grid operators, keeps a list of approved plug-and-play devices. A device that is not on that list may not be used or registered. Always check the exact model (and, where stated, the firmware) against the current list; it is updated regularly.

Flanders (Fluvius)

  • Fluvius explicitly states that the rules also apply to plug-in batteries.
  • Registration via Mijn Fluvius is mandatory within 30 days if the combined inverter output is 800 W or more or if you do not have a digital meter. Register this device as well if you want payment for its exported electricity.
  • Below 800 W with a digital meter, registration is not mandatory but remains recommended. Without registration, export from this device generally does not qualify for payment; an existing contract for fixed solar panels may be an exception.
  • Plug-and-play devices count as appliances, not as fixed installations: an AREI inspection is not required. Different rules apply to fixed storage systems.
  • You activate the P1 port of your digital meter in Mijn Fluvius (port management).

Wallonia (ORES, RESA, AIEG, AIESH, REW)

  • Every plug-and-play device must be registered with your distribution system operator, using that operator's form.
  • ORES states that you need a communicating (smart) meter for this and that every battery must be homologated by Synergrid and registered with ORES.
  • For plug-in solar kits, CWaPE strongly recommends a dedicated circuit and rules out portable power strips. Its communication does not address batteries separately.

Brussels (Sibelga)

  • According to Sibelga, registering a battery is a legal obligation, including for plug-and-play batteries.
  • A plug-and-play battery does not need an inspection report, but it must be registered and be on the C10/26 list. Sibelga asks for your EAN code and the capacity in kWh.

Batteries: control and export

  • According to Synergrid, the devices together may not export more than what your solar panel can export.
  • An energy management system that measures at the connection point is required. Since 15 October 2025, the P1 port of the digital meter has been a fully-fledged alternative to the EnFluRi sensor for this purpose.

What is still uncertain

  • Output per wall socket. Synergrid writes that plug-and-play devices are "in principle" limited to 2,600 W, but the regions recommend 600 to 800 W. There is no unambiguous legal maximum per wall socket in the sources we read. What is certain: in Flanders, registration is mandatory from 800 W.
  • Battery without solar panels. Synergrid links a battery's export to what your solar panel can export. Whether a stand-alone plug-in battery without solar panels may export is not explicitly stated in the sources. Check with your grid operator.

Sources

This page is a summary, not legal advice. In case of doubt, your grid operator decides. Back to rules per country.