In Germany, plug-in solar panels (Steckersolargeräte) are subject to clear limits and registration in the Marktstammdatenregister. For storage with such devices, the rules are still changing. Sources accessed on 27/09/2026.

In short

  • Plug-in solar panels: maximum 800 VA inverter output and 2,000 W module output per metering point (Bundesnetzagentur).
  • Since Solarpaket I (16/05/2024), you no longer need to register such devices with the grid operator; registration in the Marktstammdatenregister (MaStR) is sufficient.
  • You register a battery in the MaStR as a separate unit. Non-stationary devices such as portable batteries or power stations do not need to be registered.
  • A bidirectional meter is required; an old meter is temporarily tolerated until it is replaced.
  • The product standard DIN VDE V 0126-95 (12-2025) covers plug-in solar panels, but explicitly does not cover devices with storage.

What is still uncertain

  • Stationary or portable? Whether a plug-in battery counts as stationary (ortsfeste) storage and therefore has to be registered in the MaStR is not explicitly stated in the texts we read.
  • Plug-in solar panels with storage. According to the Verbraucherzentrale, there is not yet a simplified scheme for these. That is an interpretation by a consumer organisation; we have not read the legal text itself.
  • New law. The government approved the EEG revision 2027 on 29/07/2026; the Bundestag received the bill on 10/09/2026. What it contains regarding storage is not yet final.

Sources

This page is a summary, not legal advice. Back to rules per country.

From explanation to choice

The product finder shows up to three suitable systems; the calculator uses your own figures.